Background: - This layout, owned and operated by Terry Johnson of Denver Colorado is one of four that Terry has created. It is is a combination of a two-rail O scale run on the bottom level, a three-rail O scale in the middle level and the top level is American Flyer. All track and turnouts are Atlas. Construction was started in October of 2002 and finished in the fall of 2005.
Layout Diagram
Total layout size is 27' wide by 34-6" deep. The black lines represent the O Scale 2 rail layout that runs on the bottom layer. The pink lines represent the 3-rail that runs on the middle level. The turquoise lines represent the American Flyer layout which runs on the top back level. The shaded box on the bottom is for a lift-bridge to allow access.